Expertise

Wade Adams is a full-service general construction and project development company with the resources and expertise to handle projects of any size, location or complexity.

Interchanges, Tunnels & Highways

Wade Adams is an international authority on tunnels, interchanges and highways. With an in-depth knowledge of working in multi-terrain environments, Wade Adams’ technology and methods are globally recognised as the industry benchmark.

Water Supply, Drainage & Sewerage Systems

As rapid urbanisation increases, so is the demand for potable water and sewerage services. Wade Adams has the infrastructure, experience and expertise to install the required pipelines, pumping stations and complete sewerage networks.

Infrastructure for Residential Complexes

Wade Adams is a world leader in constructing infrastructure for residential complexes. It pioneers new technology, streamlines operations, and implements advanced project management systems to overcome challenges, both on and off site.

Mechanical, Electrical & Plumbing Systems (MEP)

Wade Adams has one of the best-equipped MEP divisions in the Gulf region. Offering both standalone services and integrated solutions, we have executed MEP works in major infrastructure projects for power agencies, transmission and distribution networks, and water treatment plants.

Marine Works

Our experience in this field encompasses dredging and reclamation work, shoreline protection and rock armouring, beach formation, breakwaters and groynes, coffer dams, sea wall construction, piers, jetties, pilling and overwater bridges – and all necessary utilities and services.

Dam Construction

We are experts in the field of dam building. As well as having an in-depth knowledge of working in multi-terrain environments including mountainous land, we are highly skilled in the use of explosives.

Bulk Earthworks & Grading

Wade Adams carries out substantial bulk earthworks and grading activities in varied environments, for both infrastructure projects and separate large-scale earthmoving contracts.

District Cooling & Chilled Water Systems

Wade Adams is helping the region to keep its cool with its specialist district cooling services. Qualified engineers, fabricators and welders are appointed for every project and given access to specialised equipment for testing and commissioning as required.

Residential, Industrial & Building Complexes

Wade Adams is helping to define the skyline of cities across the Gulf with its portfolio of innovative, creative and visionary buildings.

Irrigation, Landscaping & Theming Projects

Our expertise goes beyond urban infrastructure. From theme parks to wildlife sanctuaries, we have the construction skills and resources to make every client’s vision a reality.

Airport Construction

Wade Adams is a trusted construction partner for airport projects, both big and small. It has the resources and industry expertise to anticipate and overcome the unforeseen challenges that are commonly faced in airport construction.

Oil & Gas

Wade Adams Middle East has been active in the oil and gas sector since 1999, when it established the wholly owned company Union Energy. In a joint venture with another Sharjah-based group, Union Energy formed the National Oil Storage Company (Nosco), which owns an oil and bitumen terminal within Sharjah’s Hamriyah Free Zone.

Jogging & Cycle Tracks

Wade Adams is collaborating with RTA and visionary leaders, in providing and establishing world-class leisure infrastructure facilities in the UAE.

About us

Wade Adams has been at the forefront of the construction industry in the Gulf region for almost 40 years. We design, innovate, build and develop: it’s what we know and do best.

Group President Message

It all began for Wade Adams over 40 years ago with a small fleet and team in the African continent – and today I am enormously proud of our growth to become one of the top contractors in the Gulf region.

Vision & Values

Our vision is to lead the infrastructure construction industry in the market we serve. We aim to constantly challenge ourselves with our commitment to innovation and sustainable engineering.

Awards & Accreditations

Wade Adams is proud to be publicly recognised for its innovation, environmental initiatives and diverse construction services.

Our Assurance

We are committed to create value for our customers by continually improving our systems and processes.

Sustainability

We believe that sustainability is not just about reducing our impact on the environment, it’s also about making a positive difference to the people living and working within our buildings and developments.

Facilities & Resources

Wade Adams is well equipped to meet all the requirements of its diverse client base. From manpower to machinery, the company has the in-house facilities and resources required to handle construction projects of any size.

Careers

As an equal opportunity employer, we recruit both globally and locally to build a diverse team that is united in a mutual desire to drive our business forward.

Group Companies

View the groups and companies operated by Wade Adams (Middle East) Limited

Downloads

Visit our downloads library to view and download our online documents.

Construction of Roads, Infrastructure and Public Realm for Sector E25

Construction of new Roadways, Parking areas, Side walks, Storm Water Drainage, Sewerage Network, Water Supply Network, Power Supply Network, Road Lighting, Telecommunication Network, Utility Relocation and/or Protection, Landscape works and other related construction.

View details

Residential building at Umm Al Hassan, GF + 4 + Penthouse

This residential building was constructed in 2004 and is in a prime residential area in Bahrain. The Umm Al Hassam neighbourhood consists of large villas and several newer residential buildings. The luxury residential buildings includes a ground floor, four typical floors and a penthouse.

View details

Construction of Five Marine Service Stations in Northern Emirates

View details

DUBAI STUDIO CITY

BARASHI LAND DEVELOPMENT, SHARJAH

EARTHWORKS AT JEBEL ALI VILLAGE

LEVELLING WORKS AT AL WARQAH RESIDENTIAL AREA, PHASE 2

ACACIA GARDENS TECOM SITE, ROADS & INFRASTRUCTURE WORKS

IBN BATTUTA MALL – ROAD WORKS, PARKING & SIGNALISED JUNCTION

DUBAI INTL FINANCIAL CENTRE – WESTERN ROAD & SERVICES DIVERSION

DUBAI INTERNATIONAL FINANCIAL CENTRE – INTERIM SERVICES DIVERSION

THE LAKES DEVELOPMENT HATTAN – II ROADS & INFRASTRUCTURE PHASE 1

ROADS IN ZA’ABEEL AREA

Khor Fakkan Corniche

ROADS & ANCILLARY WORKS AT PORT RASHID

AL WASL ROAD, PHASE 2

ROADS IN SOUTH AL AMAL HOSPITAL

ROADS SOUTH OF SAFA PARK

EXTENSION OF SEEF ROAD

ROADS IN JUMEIRAH 1-5

Prospect Heights, Phase 1 Tijara town

TRANSMISSION PIPELINE IN CENTRAL AREA

SUPPLY, INSTALLATION, TEST & COMMISSION 100 MM TO 450 MM DIA WATER DISTRIBUTION NETWORK

Supply, installation, test & commission 100mm to 450mm diameter water distribution network of fibre cement. glass reinforced plastic/ glass reinforced epoxy pipes, at various locations in Dubai, including change of house connections & associated works.

SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF FIBRE CEMENT/ GLASS REINFORCED PLASTIC/GLASS REINFORCED EPOXY/ DUCTILE IRON WATER TRANSMISSION PIPE LINES

Supply, installation, test & commissioning of fibre cement/ glass reinforced plastic/ glass reinforced epoxy/ ductile iron water transmission pipe lines & associated works at various locations in the Emirates of Dubai (1,200mm diameter pipeline, along Sheikh Zayed Road)

SUPPLY, INSTALLATION, TEST & COMMISSION 100 MM TO 450 MM DIA WATER DISTRIBUTION NETWORK

Supply, installation, test & commission 100mm to 450mm diameter water distribution network of fibre cement/ glass reinforced plastic/ glass reinforced epoxy pipes at various locations in Dubai, including change of house connections & associated works.

DUBAI SPORTS CITY – AREAS 1, 2 & 4 SEWERAGE TREATMENT PLANT CIVIL WORKS

JUMEIRAH & AL SAFA SEWERAGE & DRAINAGE, PHASE

JUMEIRAH & AL SAFA SEWERAGE & DRAINAGE

SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 1,200MM DIA A/C TRANSMISSION WATER MAIN FROM NAJMA TO MUSHRIF & REFURNISHMENT WORK

SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 1200MM A/C PIPELINES FROM JEBEL ALI TO NAJMA BOOSTER STATION

ABU HAIL SEWERAGE & DRAINAGE

ZUBARAH LULLAYAH ROADS KHOR FAKKAN

JUNCTION IMPROVEMENTS IN DEIRA & BUR DUBAI

IMPROVEMENTS OF AL SUFOUH AREA NETWORK – ROADS R3 & R5

EXTENSION OF BENIYAS ROAD

Delma Jetty Construction

Rehabilitation work for Marsa Mugharraq Port phase 1, 2 & 3: Construction of 260m long Jetty consisting sheet pile facade with reinforced concrete capping ro-ro facilities to accommodate 5 ships at a time, along with the construction of slipway for fishing boats.

Jetty Upgrade – Jebel Dhana

Upgrade of Jetty and roll-on roll-off slipway ramp with shore protection, sheet pilling, associated road works and rehabilitation of terminal building.

Al Raha Beach Resort

New Al Safiya Building Complex

The New Al Safiya Building was built as an extension to Al Safiya Building. Located in the heart of Dubai, the new building complex was constructed to accommodate residential and commercial premises.

View details

Barakah Nuclear Power Plant/UAE Circulating Water Intake Structure Units 1 to 4

Construct reinforced concrete (RC 89,710 m3) for the circulating water intake structures for units 1, 2, 3 & 4.

MAIN IRRIGATION TANK & PUMPING STATION IN DUBAI LAND: CONSTRUCTION SERVICES

The contract comprised the construction, completion and maintenance of the two storage tank (60,0000m3 capacity each), pumping stations rooms, pumps, transformer, control panel and control desk room, supply and installation of seven vertical turbine pumps with total capacity of 500 m3/h. The single pump capacity is 830 m3/h at 100 head and two washout submersible pumps. Valve chambers and meter chamber with all associated piping works, supply and installation of MCS equipment, supply and installation of all piping within the site boundary, including all valves and fittings.

IBN BATTUTA MALL, EXTERNAL HARDSCAPE

Developing the Facilities within Nad Al Sheba Complex, Phase 2 – Infrastructure and Landscape Works

New Runway and Associated Works, Earthworks Package (Sub-Contract)

Expansion of the Abu Dhabi International Airport, Mubadala Strata Infrastructure Phase 1 for Al Ain International Airport

Demolition of existing structure & site clearance, construction of roads, earthworks, road signs and markings, sewerage network, potable water network, storm water network, electrical relocation works, street lighting and telecommunication works.

Expansion of the Abu Dhabi International Airport – Design and Build Apron and Incidental Works at Sir Bani Yas Island Airport

The project comprised, utility distribution networks, electric power and potable water supply network, fire, water, chilled water and irrigation water distribution, sanitary sewer network, storm water network and detention pond, communications system distribution, as well as construction of new Car Park curve road, widening of main entrance road and business park road network.

Pavement Works for Sweihan Air Base

Construction and completion of wet mix and asphalt pavement works for the runway and taxiways at Sweihan Air Base.

AL MINHAD AIRBASE, PAVEMENTS WORKS FOR AL MINHAD AIRBASE (Sub-Contract)

DUBAI INTERNATIONAL AIRPORT, ACCESS ROAD & PARKING, PHASE 2

DUBAI INTERNATIONAL AIRPORT ACCESS ROADS & PARKINGS – ADVANCE WORKS AT DEPARTURES

DUBAI 2000 AIRSHOW, ROADS AND INFRASTRUCTURE SERVICES

The work comprised road works, road and apron lighting, landscaping, stormwater drainage, sewerage, water supply network, fire fighting, irrigation works, electrical power supply & distribution, civil works for telecommunications network and retaining walls.

Oil Storage Terminal at Hamriyah Free Zone

The terminal originally comprised tanks for 22,000 metric tons of diesel, 10,000 metric tons of fuel oil and 5,000 metric tons of bitumen; complete with receiving, handling and distribution facilities.

View details

Dredging Reclamation & Shoreline Protection Works at Busayteen and West Hidd, Kingdom of Bahrain

The original works consisted of the dredging and filling of 27.75 million m3 of sand, together with rock armouring, to provide platforms for future developments. The works were later varied to cater for the addition of 856,000 m3 of rock core

View details

Design & Construct New Orbital Highway & Truck Route & New Doha Port to Orbital Highway

The project comprises the surfacing works (Lot 1) at the detour junction 17 & 13 and section 1 at Mesaieed Road 1.

Construction of Remaining Works for Crushed Stone Import Facilities Roads & Bridges, Mesaieed

Subcontracted for the supply & the laying of an asphalt wearing course of 5,200 tons.

Qatargas – II Development Project

The project comprised enabling works, which included earthworks, roadworks, utilities & minor structural work.

Mixing of Reclaimed Materials & Filling Work

This project comprised the mixing of reclaimed materials & filling works.

Construction of Roads & Landscaping at Qatalum Project

Enlargement of Existing Water Outfall/Channel, Earthworks and Concrete Works

View details

Land Development at Al-Wukair

A land developing Project, works involved substantial earthworks of volumes of 500,000m3 and the construction of an access road of 5km.

Land Reclamation for the LPG Tankage Area, Ras Laffan

Subcontracted for the land reclamation, the project comprised earthworks at the tankage area of Qatar Petroleum's refinery at Ras Lafan Area.

Roads & Infrastructure in Doha Industrial Area (Package 2)

Located in the Doha Industrial Area, with a value of QAR 1.2 billion, this project involves the upgrading of the existing industrial area with the construction of a 42km new road system, installation of all utilities networks, a surface water network with 6km of microtunnelling, the construction of 60km property boundary walls and landscaping.

Roads & Infrastructure for Commercial Street in Al Khor Area

Located in the Alkhor Area 60km away from Doha, this project within the busy commercial street 5.4 km long, involves works for the improvement road alignment and road cross sections, along with installation of services including surface drainage using Micro tunnelling of 4.1km, utilities, landscaping and the construction of a pumping station and lagoon.

Construction of Doha & Rayyan Sewerage Improvements to existing TSE Network

Located in the busiest main streets around Doha, this project involved the upgrading of the TSE Network with the laying of Dl Pipes, reinstatement of roads and substantial landscaping works.

Construction of Roads, Utility Crossings & Street Lighting in the Industrial Area, Mesaieed (Package 6)

Located at the Qatar Petroleum's Mesaieed Refinery area, work involved the construction of a roadworks system, street lights and substantial utilities installation and water drainage, irrigation mains and landscaping.

View details

Epic for Dukhan Coastal Facilities Road

The Project was at the Qatar Petroleum's Refinery area at Dukhan Area and involved the construction of the coastal road 2.5km, earthworks, excavation and filling and asphalt laying operations.

Epic for Dual Carriageway from Ras Laffan Avenue & Halul Avenue Extension

Located at the Qatar Petroleum's Ras Lafan Refinery, this project comprised earthworks, the construction of a roadworks system, street lights and substantial utilities and water drainage installation.

Epic for Temporary Safety Improvements to Existing Sealine Road, Mesaieed

Located at the Mesaieed refinery area, sealine coast area; the project involved infrastructure works, including road works, construction of bridges and underpasses, along with the installation of utilities along the 11km carriageway.

Epic of New South Side Roads & Grading of Corridors at Ras Laffan

Located at the Qatar Petroleum's Ras Lafan Refinery, this project involved earthworks of approx. 4.5m3 over an area of 4m2. Additional work involved the construction of a roadworks system, street lights and substantial utilities and water drainage installation.

Slope Protection and Crash Barriers for Roads within Dukhan

This project was to improve the slopes on the road system at Dukhan Area, as well as the construction and installation of vehicle crush barriers through earthworks and geotextile membrane.

Epic of Lay-bys and Road Upgrade in Dukhan Fields

The project comprised the construction of lay-bys on the Dukhan to Salwa highway and the reconstruction and improvement of roads at the Dukhan refinery fields.

View details

Epic of Roundabout & Truck Route to Sand Quarry, Mesaieed

Located at the Qatar Petroleum's Refinery area at Mesaieed Area, this project involved works for the construction of a roundabout and the construction of a truck road towards the sand quarry.

Construction of Roads & Landscaping at Dukhan

This project located at the Qatar Petroleum's refinery area at Dukhan involved construction of a new dual carriageway, as well as the improvement of the existing road towards the Umm Bab area.

Construction of Roads, Utilities & Street Lighting at Mesaieed Industrial Area (Package 2)

Located at the Qatar Petroleum's Refinery Area at Mesaieed, this project comprised the improvement and upgrading of the existing carriageway and installation of utility services.

View details

Construction of roads, utilities & street lighting at Mesaieed Industrial Area (Package 1)

Located at the Qatar Petroleum's Refinery Area at Mesaiied, this project involved the improvement and upgrading of the 6km carriageway and installation of utility services.

View details

Epic of Street Lighting & Vehicle Crash Barriers between Mesaieed & Wakrah

This project included the installation of street lights and other electrical traffic systems, as well as the construction and installation of vehicle crush barriers.

View details

Engineering, procurement, installation and construction of dual carriageway between Dukhan & Umm Bab

The project comprised heavy Infrastructure works, including road works, construction of bridges and underpasses and the installation of utilities along the 25km carriageway.

View details

Grading & Roadworks Construction at Ras Laffan

This Project was at the Qatar Petroleum's Refinery area at Dukhan and involved substantial volumes of earthworks, excavation and filling, along with asphalt laying operations.

Infrastructure Works – Packages 1 & 2

The works are to be carried out at Mohammed Bin Rashid Al Maktoum City - District One. The Bicycle and Jogging track and associated work comprises the construction, testing and commissioning of the site wide bicycle and jogging tracks.

World Deserts

World Desert phase 1 of the Al Ain Wildlife Park & Resort comprised the construction of various buildings for administration, operation and other amenities, outdoor soft landscape, play equipment installation and hardscape infrastructure and utility works and artificial rock works theming and landscaping.

Sir Bani Yas Hotel Development Package & Hotel Refurbishment: Upgrading and External Works

The project included the refurbishment and upgrading of existing buildings, construction of additional satellite buildings, plant buildings and a staff accommodation complex, access roads, hard standings, landscaping and all other related civil works and infrastructure utilities.

Villa Complex Phase III, Infrastructure Package

The project included the construction, completion and maintenance of Infrastructure at Villa Complex Project Phase III

Developing Facilities within Nad Al Sheba Complex, Phase 2

This project is located in Nad Al Sheba Complex, Dubai. The project comprised the construction of two buildings; one addressing a utility building with below ground reservoir as well as iconic sport pavilion. The work also included full infrastructure work serving the above building, the existing building along the edge of the zone, as well as the site that shall come to be fully landscaped including a fountain and shade structures.

Arabian Ranches Development, District 8 Polo Villas

Infrastructure Works Jumeirah Lakes Towers

The project comprised infrastructure works to JLT Embankment and RTA Road Works excluding external utility connections to plots AA1, BB1 and BB2 - Milestone 1.

Dubai Healthcare City – Phase II, Roads & Services (Areas 1, 2 & 3)

Villa Complex for Dubai Silicon Oasis – Phase 1 Infrastructure Package

The scope included kerbs, footpaths and asphalting coordinated with the villa construction works.

The Palm Deira, DI Front Infrastructure Works – Access Road & Utilities

The Palm Deira is located near Al Hamriyah Port, off the coastline of Deira, adjoining the mouth of Dubi Creek and Al Mamzar park. Palm Deira is a landmark new city that represents a well planned and integrated development and constitutes two distinct developments, Deira Islands and the Palm Deira. Deira Islands constitutes five Islands, Deira Island (Front), Deira Island (Central), Deira Island Island (North), Deira Island (South) and Deria Island (Al Mamzar).

Key Villas at Dubailand Infrastructure Works

The Villa at Dubailand Remaining Infrastructure Works

Arabian Ranches Development Residential Villas, District 7 (A,B,C & H) Phase II

Tijara Town (Global Business Exchange City) Infrastructure Contract

The project included the complete construction of Tijara Town, comprising roads and infrastructure works.

Arabian Ranches Development District 6 (A,B,C,D,E & F)

Arabian Ranches Development District 7, Infrastructure Works Phase II

Works comprised the carrying out and completion of District 7D, E, F & G - infrastructure works forming part of the Arabian Ranches Development.

Villas for TECOM in Dubailand Earthworks Package

Arabian Ranches Development, Infrastructure Works, Phase II District 5A & B

The works comprised carrying out and the completion of district 7A B & C - infrastructure works forming part of the Arabian Ranches Development.

558 Key Villas in Dubailand – Road & Infrastructure Works

The site is located between Emirates Road and the outer bypass. The work comprised the construction of a road network and associated infrastructure. The road works included the construction of a road network inside the development, carrying out excavation, filling, aggregate sub-base and base layers, asphaltic concrete pavement courses, road markings and furnishings. While the construction of infrastructure services included storm water drainage and irrigation, sewerage, water, telecommunications and water street lighting, together with a small amount of landscaping

Arabian Ranches Development Infrastructure Works, Phase II District 3B

The work comprised the supply and construction of the landscape and irrigation works - Package 12A, which included open spaces & streetscape at District 3B, Arabian Ranches Development.

The Villa at Dubailand Road & Infrastructure Package

The Villa, will be a unique residential development with 2,000 residential units, with direct access from the main Dubai Link road, making this prestigious development easy to reach. Forming part of the huge Dubai Land project, the works included the complete construction of bulk earthworks for the whole development and the cut and fill of 1,880,000m3 material strictly according to specifications.

Arabian Ranches Development Infrastructure Works to District 4A & B

The works comprising the carrying out and completion of District No. 4 Infrastructure Works forming part of Arabian Ranches Development. The works are to be carried out at the Arabian Ranches Development in the Emirates of Dubai.

Mirdif Villas Roads & Infrastructure

This project located in community 251 Mirdif to the east of Algeria Road and north of Tripoli Road and adjacent to Musrif Park. The works comprised road infrastructure works including all services.

Arabian Ranches Development District 7, Sectors E, F, G & H

The works comprised carrying out and the completion of district 7A B & C - infrastructure works forming part of the Arabian Ranches Development.

Infrastructure Works to District 3A – Arabian Ranches Development

The works comprised carrying out and the completion of district 3A - infrastructure works forming part of the Arabian Ranches Development.

Arabian Ranches Development Infrastructure, District 6

The works comprised the carrying out and completion of district 6 - infrastructure part of the Arabian Ranches Development.

Arabian Ranches Development Infrastructure, District 5

The works comprised the carrying out and completion of district 45 - infrastructure works forming part of Arabian Ranches Development.

Arabian Ranches Development Infrastructure, District 4

The works comprised the carrying out and completion of district 4 - infrastructure works forming part of the Arabian Ranches Development.

View details

Arabian Ranches Development Infrastructure, District 8

The project comprised carrying out and the completion of miscellaneous infrastructure and service utilities works in respect of district 8 forming part of the Arabian Ranches Development.

Emirates Hills Development The Springs Phase 1 & The Meadows Phase 2

Works comprised the carrying out and completion of The Meadows 2 and The Springs 1 infrastructure package of the Emirates Hills Development.

Emirates Hills Development Springs Phase 7 & 8 and Meadows 3 & 5

The project included the carrying out and completion of the Springs 7 & 8 and The Meadows 3 & 5 infrastructure works at the Emirates Hills Development.

Dubai Land Residential Complex (DLRC), Dubai Health Care City II

This project included the supply and installation of a complete chilled water production system, with all necessary equipment, piping works with all associated fittings, valves and accessories, and the provision for all the required plant; manpower materials, equipment and other resources necessary to execute the construction, pre-commissioning, and commissioning works.

View details

International Media Production Zone (IMPZ) District Cooling Project

This project included the construct, complete and maintain in the defects liability period, the chilled water piping networks at the International Media Production Zone and Business Bay, Al Habtoor Tower.

View details

Dubai Design District (D3) Cooling Project

Business Bay Phase 1 & 2 District Cooling

Construction, completion and maintenance during the defects liability period of the phases 1 & 2 district cooling projects, including connection with the northwest pipe network extension.

TECOM-C District Cooling Project, Jbr Al Bateen

Business Bay Phase 1 & 2 District Cooling: North West Pipe Network

All works included in connection with executing and completing the electrical equipment, concrete foundations and completing the works in connection with the main North West District Cooling Plant; all mechanical works including but not limited to supply, installation, testing, commissioning of the works. Completing the main pipe network to deliver chilled water Buildings, including but not limited to supply, installation, testing, commissioning, flushing and chemical treatment.

Business Bay Phase 1 & 2 District Cooling: TP05 & TP11

This project included the construction, completion and maintenance during the defects liability period of the TP05 & TP11 District Cooling distribution Pipe Network Extension, which comprised approximately 1.0km of trenches accommodating two carbon steel-pre-insulated pipes of varying sizes, including main trunks of 600mm diameter and 1200mm diameter pipes.

Business Bay Phase 1 & 2 District Cooling: Main (North West)

The project comprised all works in connection with executing and completing the electrical equipment, concrete foundations and completing the works in connection with main north west District Cooling Plant and all mechanical works, including but not limited to the supply, installation, testing, commissioning of the works.

Business Bay Phase 1 & 2 District Cooling: TP11

The project included all works in connection with executing and completing the electrical equipment concrete foundations and completing the TP11 semi-permanent district cooling plant and all mechanical works, including but not limited to the supply, installation, testing, commissioning of the works.

Business Bay Phase 1 & 2 District Cooling: TP04

The project included all works in connection with executing and completing the electrical equipment concrete foundations and completing the TP04 chilled water pipe network to deliver chilled water to buildings, including but not limited to the supply, installation, testing, commissioning, flushing and chemical treatment of the whole of the works.

Business Bay Phase 1 & 2 District Cooling: TP10

All works in connection with executing the electrical equipment, concrete foundations and completing the semi-permanent district cooling plant and all the mechanical works in connection with executing and completing the chilled water pipe network, to deliver chilled water to buildings, including but not limited to the supply, installation, testing, commissioning, flushing and chemical treatment of the whole works. All remaining works with associated testing, comprising of any outstanding reinstatement of removed or diverted services, any remaining earthworks and any remaining reinstatement of surfaces.

Dubai Land Residential Complex – Sky Courts

The project was in connection with the mechanical works necessary for the delivery of chilled water to buildings, testing, commissioning, flushing, chemical treatment of the whole chilled water distribution piping network and civil works.

Business Bay DM Corridor – District Cooling Distribution Pipe Network Project

The project comprised; the supply, installation, hydro testing, flushing, cleaning, passivation, commissioning and handover; together will all measured items required in support for supplying chilled water.

Business Bay Phase 1 & 2 DC Line-7

In connection with the mechanical works necessary for the delivery of chilled water to buildings, the project included but was not limited to the supply, installation, testing, commissioning, flushing and chemical treatment of the whole of the chilled water distribution piping network, excluding only the civil works, reinstatement of all surfaces and the removed/ diverted services.

Chain Link Fence for Boundary Line Contract MW/2215

Supply and installation of 3.5m high security fence from Al Ain to Umm Zumool along the Oman-UAE Border.

SASCO Expansion Project SHJ/007/TS02

The project included the modification of the existing tanks (T2, T3 & T4), inlet and outlet MOVs to integrate with the new MOV Controller. Scope the modification on the existing tank inlet and outlet MOV actuators, with necessary hardware for interfacing with the new MOV controller.

Jafza South Solar Street Lighting Phase 3

The project is located in Jebel Ali, surrounded by Sheikh Zayed Road from the north west, Emirates road from the south east, Road D53 from the south west, and road E77 from the north.

Reem Oasis Development, Shallow Services & Internal Roads – Package 4 & 5

The works comprised the carrying out and completion of Reem Oasis 01, 02 & 03 - shallow services and internal road Package 4 & 5, forming part of the project known as Reem Oasis Development.

Bicycle & Jogging Tracks

The works are to be carried out at Mohammed Bin Rashid Al Maktoum City - District One. The Bicycle and Jogging track and associated work comprises the construction, testing and commissioning of the site wide bicycle and jogging tracks.

MBR Gardens Development, Dubai Hills Estate, Shallow Services & Internal Roads

The project comprised the carrying out and completion of an irrigation pumping station including tie-in connection to the existing irrigation main line and construction of Golf Cart underpass M1-1 and M1-2 and all associated works.

Al Khawaneej Labour City

The work comprised of road and infrastructure works of the project known as 9022 Al Khawaneej Labour City. The scope of this project included construction roads, street lighting network, telecommunication works, fire fighting tank and storm water drainage network.

View details

MBR Gardens Development – Dubai Hills Estate – Irrigation pumping station works (IPS-01)

The works comprised the carrying out and completion of roads, road lighting and shallow services in respect of the main road - 1 extension and temporary spine road.

Jafza South LED Street Lighting Phase 2

The project is located in Jebel Ali, surrounded by Sheikh Zayed Road from the north west, Emirates road from the south east, Road D53 from the south west, and road E77 from the north.

Jafza South Solar Street Lighting

The project is located in Jebel Ali, surrounded by Sheikh Zayed Road from the north west, Emirates road from the south east, Road D53 from the south west, and road E77 from the north.

Jumeirah Village & Jumeirah Park Interim Access Road

The Construction of the link Road between Jumeirah Park and Jumeirah Village II - Triangle. It also includes the street lightning of the link road, as well as the upgrade of the traffic signal located at the intersection of this link road with Jumeirah Village II Road.

Tecom Roads Improvements, Infrastructure Works

The project site is located in TECOM Site A,B, C and D. The project aims to implement the rewiring improvements recommended by the approved traffic impact study, to facilitate the movement on the internal network and the tie-in points with the surrounding Dubai Municipality road network, in order to accommodate the increasing traffic within TECOM sites A and B.

The Palm Jumeirah Civil Works for ACMS, PDC & SCADA

The scope of works included the supply and installation of the pvc cable duct network required for the three systems of small power and fibre optic for ACMS Network, four by 100mm diameter ducts and associated pull chambers, PDC Network - two 100mm diameter ducts and associated pull chambers, SCADA Network - two 100mm diameter duct and associated pull chambers.

Dubai Waterfront – Madinat Al Arab – Al Oud District A Construction

The Dubai Waterfront project is a landslide development located at the base of the Palm Jebel Ali Phase 1 running parallel to the coast for a distance of approximately 3.5km.

Dubai Sports City – Canal Infrastructure & Bridges

The works comprised the supply, installation, construction, and remedy of any defects of a feature canal, including precast reinforced concrete walls and HDPE liner; supply, installation, construction, and remedy of any defects of four reinforced concrete pedestrian bridges, a vehicular Bridge incorporates the filtration plant rooms under the approaches.

Dubai Healthcare City Phase II, Roads & Services (Areas 1, 2 & 3)

This project situated in areas 1,2 and 3 of the DHCC II area, The project consists of the construction of roads, foul sewerage, storm water drainage, potable water supply, irrigation, street lighting, electricity ducts and sub-station buildings, telecommunications ducts and service tunnels

Dubai Sports City Areas 1, 2 & 4 Infrastructure Works

The project site, 242 hectares, is located within the Dubai Land Development project and is bounded to the north by Emirates Road and undeveloped land to the east, south west.

Jumeirah Beach Residence Package 0522 – Site Wide Infrastructure & Utilities

The project was a mixture of commercial and residential facilities comprising 36 residential buildings, providing in excess of 6,000 units of residential accommodation, retail units and four hotels.

View details

Emirates Hills Development Critical Route Telephone Works

Internal Roads at Various Locations at Al Ain Stage 18

The project included internal roads and parking at various locations in Al Ain City.

Sir Bani Yas Island Package: Design & Construction of Coast Protection Main Works

This project included the design and construction of coastal protection comprising North Beach construction with 2 million m3 of dredging works to form a 1.50km beach, 30m wide, 720m groynes, and the construction of North Marina with 300m groynes and a 180 x 15m wide Mega Jetty and Pontoon for Marine Craft Docking facilities.

Support Facilities South Airfield Development & Rehabilitation Construction Package 2

This project included the extension of Taxiway Network (2.5km main Taxiways, plus connecting taxiways) 100,000 m2 of apron slabs for cargo area, networks for fire fighting, electrical distribution, communications, airfield ground lights, storm drainage. various auxiliary buildings airside roads and fencing, main jet fuel system, 20,000m of jet fuel lines with fuel hydrants and remediation works on the existing Taxiway F.

Ruwais Housing Complex Expansion – Phase III, External Infrastructure Works for Packages 10 & 12

"Package 10 works included construction of infrastructure works for Ruwais Shopping Mall such as car parks and landscaping including a water feature, road works, potable water, electrical, sanitary and storm water, fire fighting and irrigation networks.

Khalifa Port & Industrial Zone (KPIZ) Project Contract

Construction of secondary infrastructure for development at Khalifa Port Industrial Zone Area 'A'. Major and minor road network, electrical network with 5 substations and street lighting, sewer and storm water network including 5 lifting stations, potable water and irrigation network and hardscaping.

Road, Infrastructure & Public Realm for Sector E-25 – Phase 1

The project comprised the construction of new roadways, parking areas, side walks, storm water drainage, sewerage network, water supply network, power supply network, road lighting, telecommunication network, utility relocation and/or protection, landscape works and other related construction.

MWD – Motor World Development Project, Infrastructure Works Phase 1

Construction of Infrastructure works for Motor World Development Project Phase 1 including road works, water supply network, street lighting, power network, storm water & drainage network, sewerage network, irrigation network and telecommunication duct works.

Expansion of the Abu Dhabi International Aiport: T1-T3 Business Park Grading

Utility Distribution Networks: Electric power and potable water supply network, Fire, Water, Chilled water and Irrigation water distribution, sanitary sewer network, storm water network and detention pond, communications system distribution, as well as construction of New Car Park curve road, widening of main entrance road and business park road network.

Saadiyat Beach Residential Infrastructure (SB12 – SB18) and Edge Protection Works

The project comprised; infrastructure works for 660 villas, gravity sewers, potable water pipelines, storm water drainage network, construction of roads, lighting, signage, telecommunication and electrical networks including 21, 22 KV Substations and 1km of seashore revetment and land reclamation.

Internal Roads for 100 Low Cost Houses in Al Waqan

This project included the township development roads, footpaths, utilities, sewer networks and sewage treatment plant complex

Internal Roads for 200 Low Cost Houses in Al Quo’A

This project included the township development roads, footpaths, utilities, sewer networks and sewage treatment plant complex.

Roads & Drainage in Turfana & Rifaa

The contract provided the construction of roads and drainage in Turfana and Al Rifaa Areas in the City of Sharjah. The works comprised approximately 26.5km of single carriageway, 7.5km reconstruction of existing single carriageway, parking and footpath together with associated utilities and services including surface water & foul water drainage.

DS158 – Main Irrigation Lines at Sheikh Zayed Road

The project included the construction of the irrigation main line along Sheikh Zayed Road from the intersection of the Jebel Ali Road and Lehbab Road to the border between the Dubai Emirates and Abu Dhabi Emirate. This also included the supply of all pipes, valves and fittings complete with all associated civil/ earth works.

Jebel Ali Hills, Infrastructure Works – Package 3

Jebel Alli Hills is located within the Jebel ali area, along Sheikh Zayed Road on the southern side. The works included, providing the full infrastructure requirement of the development including road network, service reservations, storm water drainage, street lighting, traffic control, road signage and marking, potable water system, sewerage collection, combined irrigation/ fire fighting system, lectronic power, telecommunications, landscape and secondary irrigation.

Construction of Roads & Sewerage Network for Deira Island A

Arabian Ranches II – Phase 2, Deep Services Package

MBR Gardens Development, Dubai Hills Estate, Deep Services in Main Road 2 & 3

Al Quoz 2nd Sewerage Networks Stage 2

MBR Gardens Development – Dubai Hills Estate, Irrigation Pumping Station Works (IPS-01)

The project comprised the carrying out and completion of an irrigation pumping station including tie-in connection to the existing irrigation main line and construction of Golf Cart underpass M1-1 and M1-2 and all associated works.

Nad Al Sheba 4th, Drainage Pumping Station

This project involved the construction of a pumping station capable of handling anticipated drainage flows from Nad Al Sheba 4, Dubai Academic City & a part of Dubia Silicon Oasis area.

MBR Development – Phase 1, Shallow Services & Internal Roads

The work comprised the carrying out and completion of shallow services and internal road Phase 1.

Sewer Network & Rising Main at Al Quoz Industrial Area

This project included the construction of sewerage system to serve Al Quoz industrial area. The works include approximately 2,620m of gravity pipes with associated manholes, road crossing by N.D.M and sewerage pumping station and 700mm diameter rising main line.

Arabian Ranches 2 Development, Utility Connection & Deep Services – Package 1

The scope of work of this project included construction of deep services of drainage & sewerage networks for areas 1, 8, 10 & 14. At area 6, the work included construction of road works and laying of services such as water, drainage & sewerage, Etisalat and du networks and the construction of pumping station & pond.

Jumeirah Lake Towers Infrastructure Works

The project provides the execution of the infrastructure, including demolition and the relocation of existing Jumeirah Island sewerage pump station; sewer pumping station; roadwork construction and associated services, the reinstatement of Jumeirah Island sea water line and construction of a new section of the existing pumping station storm water line; utilities services connection to Enterprise Zones.

Final Roads & Infrastructure Works

The scope of this project was construction of remaining works at Victory Heights project which included construction of some asphalt roads, cable laying for house connections and sewerage connections to some of the villas.

Dubai Waterfront – Badrah & Veneto Infrastructure Works

The scope of work under this project included the construction of roads and infrastructure work at Badrah and Veneto areas as a part of Dubai Waterfront. The infrastructure works included laying of drainage, irrigation, sewerage, telecommunication and fire fighting works and commissioning of water network.

DSOA Villa Complex – Infrastructure Works Phase II

This project was for the execution of modification works for the water pumping station to comply with DEWA’s requirements. The work included construction of additional chambers and replacement of HDPE liner inside the underground water tank, the final commissioning and operation of the water pumping station and final handing over to DEWA.

Engineering Works for DSOA Sewerage Connection for Developer

This project was executed at Dubai Silicon oasis for the sewerage connections for 50 completed buildings. The work included construction of some additional pipelines and chambers at individual locations within the limit of Dubai Silicon Oasis.

Engineering Works for DSOA Re-planning of Blocks 6 & 27

Dubai Silicon Oasis is a world class business and industrial park located 22km southeast of the Dubai CBD at the intersection of Emirates Road and the Dubai/ Al Ain Road. The contract comprised; re-panning of block 6, re-panning of block 27, storm water irrigation plan, storm water storage solution, ground water monitoring program.

Dubai Industrial City – Roads & Infrastructure Resumption of Works

The project comprised the completion of all sewerage and water works within the areas of contracts 3 & 4, including the sewerage pumping station/ lifting stations, construction of roads with road furniture and telecommunication containment to serve warehouse 1 & 2 and 3 along with all active developers within the areas of contract 3, 4, 6 and 9, construction of sewerage and water works to serve all active developers within areas of contract 6 and 9, construction of storm water drainage works along with all road crossing ducts, road crossing of water, irrigation and telecommunication network.

Al Barsha South 1 Sewerage & Drainage (C671)

The project provided sewerage and drainage networks to Al Barsha South 1, Community No. C671. the project comprised; sewerage network for Al Barsha South 1 with diameters range from 200 to 800mm and an approximate pipe lengths of 29km.

Dubai Waterfront – Madinat Al Arab – Al Oud, Phase 3 East Precinct 1

The project included the execution of the infrastructure woks including road works, irrigation water network, fire water network, street and area lighting, sanitary sewer network, storm drainage network, removal and rerouting of existing electrical services, HV and LV network, temporary and permanent connections to existing power and water networks, coordination with all relevant services including JAFZA, DEWA, DM, DU, RTA and Nakheel Utilities, consideration for phasing of works, provision of temporary access road.

Main Irrigation Tank & Pumping Station in Dubailand

The site location is located at the complex of irrigation pumping station is located in Mizin land, plot 73, at the southern side of Bypass road.

Waterfront – Veneto Precinct 2-10 Phase III East Precincts 2-10

The project included the execution of the infrastructure woks including road works, irrigation water network, fire water network, street and area lighting, sanitary sewer network, storm drainage network, removal and rerouting of existing electrical services, HV and LV network, temporary and permanent connections to existing power and water networks, coordination with all relevant services including JAFZA, DEWA, DM, DU, RTA and Nakheel Utilities, consideration for phasing of works, provision of temporary access road.

Key Villas at Dubailand / P-113 Water Supply Pipeworks

The site is located between Emirates Road and the proposed outer bypass. The scope of works comprised the construction of a 300mm AC water pipeline.

Dubai Waterfront – Madinat Al Arab – Al Oud District A Construction

The Dubai Waterfront project is a landslide development located at the base of the Palm Jebel Ali Phase 1 running parallel to the coast for a distance of approximately 3.5km.

The Lagoons Roads & Service (Area 2)

This project is situated in the southern portion of the Lagoons area. The project consisted of the construction of approximately 2km of roads, while services works comprised foul sewerage, storm water drainage, potable water supply, irrigation, fire fighting water supply, street lighting, electricity ducts and a sub-station building (11Kv), telecommunication ducts and 3 reinforced concrete causeways.

Dubai Healthcare City Phase II, Roads & Services (Areas 1, 2 & 3)

This project is situated in areas 1, 2 and 3 of the DHCC II area. The project consisted of the construction of roads, foul sewerage, storm water drainage, potable water supply, irrigation, street lighting, electricity ducts and sub-station buildings, telecommunications ducts and service tunnels.

Development of FC Water Distribution Pipelines Networks from 100MM to 300MM in Dubai

The work comprised the collect/ supply, installation, testing, commissioning and backfilling of distribution AC pipelines and service pipes at various locations in Dubai.

Infrastructure Works – Phase 2 for Dubai Silicon Oasis Site

The project lies in the south eastern part of the Dubai Urban Area and is bound by Warsan from the east, Dubai - Al Ain Road from the west, Emirates Road & Nad Al Sheba residential area from the north and Al Runway Institutional Area from the south. The contract comprised the construction, completion and maintenance of the infrastructure works which included roadworks, sewerage network, water network, a telecommunication network, Irrigation network and miscellaneous work.

Supply, Install, Distribution AC Pipelines Networks from 100MM to 300MM in Dubai

The work comprised the collect/ supply, installation, testing, commissioning and backfilling of distribution AC pipelines and service pipes at various locations in Dubai.

Main Pumping Station K, Phase III

This project included the construction of sewerage and drainage collection systems to serve the Nad Al Hamar area of Dubai. The sewerage collection systems includes approximately 90,300m of pipe ranging in diameter from 160mm to 130mm.

DMCC Industrial Area & Jumeirah Lake Towers Infrastructure & Landscaping

This Contract is for the execution of the Infrastructure works for Jumeirah Lake Towers. Jumeirah Lake Towers are at the Jumeirah Islands area, which is being prompted and developed by Nakheel.

View details

Main Pumping Station Q, Phase 1

The project included the execution, completion and maintenance of the main pumping station Q and pressure main, the main collectors in the vicinity of the pumping Station Q, Retention Pond 3 (storage volume approx. 330,500 m3), storm water pumping station located next to the Pond R3 with an ultimate flow capacity 3,200 1/s.

Al Qusais First Sewerage & Drainage (C232)

The contract works comprised the construction, completion and maintenance of the following works: sewerage works, storm water drainage works and services diversions. The work also included utility service diversion/ protection as encountered on site.

Al Qusais First Sewerage & Drainage (C233)

This project area is located between road no. 210 and road no. 206, road, road no. 211 and Al Quasais road. This project comprised the construction of sewerage collection network, including sewer mains with diameters between 200mm and 500mm, manholes and house connections. The approximate length of the network spans 10,500 metres.

Supply, Install, Test & Energise Water Transmission Mains from Mushrif Reservoir to Qusais Road

The work comprised the supply, installation, testing, commissioning and maintenance of 1,200mm, 900 and 600mm diameter water transmission mains from Mushriff Reservoir to Qusais area, through Khawaneej Road.

Development of AC Pipe Water Distribution Network at Various Parts of Dubai

The work comprised the collection/ supply, installation, testing, commissioning and backfilling of distribution AC pipelines and service pipes at various locations in Dubai.

Al Ramool Industrial Area Drainage

The project is located in the Deira side of Dubai. This project will finalise all drainage works in the Ramool Industrial area, which is bound to the north east of Dubai International Airport Road 203, to the east by Nad Al Hammar Road, to the north west by Road 206 and to the south west by Al Ramool Road.

MBR Gardens Development – Dubai Hills Estate, Golf Course Grading Works

The works comprised the carrying out and completion of various earthworks.

Green Community Expansion Phase 3 at DIP, Enabling Works Contract

The project included carrying out an enabling works package for the construction of the Green Community west extension phase III.

Villa Complex Phase III, Grading Package (P-048/A)

This project is located on Dubai Silicon Oasis complex at Nad Al Sheba. The scope included grading for the villa complex in two phases; phase 1 grading plot 9-001 and phase 2 grading plot 8-001. The work comprised all work specified for the rough grading and interfacing.

Al Remal Housing Project – Grading Works

This project is located south-west of Dubailand with frontage to the Dubai By-pass Road on its south-eastern boundary, with its border on the north-eastern and south-eastern boundaries, which will contain the main access point into the site. Golf City is the adjacent development to the northwest. The project included grading works and earth moving.

DSO Villa Complex Phase 2 / Grading Works

The site is located on DSO complex at Nad Al Sheba. The scope of works of this grading contract for the Villa Complex was carried out in two phases. Phase 1 included grading plot 9-001 and phase 2, the grading of plot 8-001.

View details

P-125 Global Business Exchange City, Bulk Earthworks

Free Zone South Infrastructure, Phase 3B

The project located at Jebel Ali Free Zone South comprised the construction, completion and maintenance of earthworks to approximately 669 hectares, comprising approximately 7,790,739m3 of excavation and 2,039,739m3 of filling to plots and road corridor separately.

International Media Production Zone, Package Roads & Infrastructure Works

The project area, measuring approximately 340 hectares, is situated to the east of the large, elliptical-shaped roundabout, which is at the northern tip of Dubai Investment Park, on the Emirates Road.

View details

Dubai Sports City – Advanced Grading Works

The project site, 465 hectares, is located within the Dubai Land Development project and is bounded to the north by Emirates Road and undeveloped land to the east, south and west.

Emirates Hills The Meadows – Phase 2 & The Springs Phase 1, 2, 3, 4, 5 & 6

The works comprised the carrying out and completion of The Meadows Phase 2 and The Spring Phases 1, 2 ,3 ,4, 5 and 6 grading and earthworks forming part of the Emirates Hills Development.

Green Community, Phase 1(67HA) Advance Grading Works

South Airfield Development & Rehabilitation Construction – Package 2

The project comprised the extension of a taxiway network (2.5km of main taxiways and connecting taxiways) 100,000 m2 of apron slabs for the cargo area, networks for fire fighting, electrical distribution, communications, airfield ground lights, storm drainage, various auxiliary buildings airside roads and fencing, a main jet fuel system, 20,000m of jet fuel lines with fuel hydrants and the remediation works of the existing Taxiway F.

Expansion of the Abu Dhabi International Airport: T1-T3 Business Park Grading

This project included the utility distribution networks, comprising; electric power and potable water supply network, fire, water, chilled water and irrigation water distribution, sanitary sewer network, storm water network and detention pond, communications system distribution, as well as construction of a new car park curve road, widening of the main entrance road and the creation of the business park road network.

Road, Infrastructure and Public Realm for Sector E25 – Phase 1

The construction of new roadways, parking areas, side walks, storm water drainage, sewerage network, water supply network, power supply network, road lighting, telecommunication network, utility relocation and/or protection, landscape works and other related construction.

Emirates Palace Hotel External Works, Package BP 14A & 14B

External works for utilities of the Emirates Palace Hotel which included; sanitary drainage, storm water, irrigation, fire fighting and water supply along with related parking for road works.

Trip Project, East Road Widening IP43A to IP145

The project comprised a total length of an approximate 9km road, along with widening by adding one new lane to each carriageway, plus the provision of new U-turns, free right turns and the modification of utilities, water features and landscaping of the median.

Construction of North East Abu Dhabi Phase I

54km of a single carriage roads in Dabbiya area including 3km of causeways with concrete multicell culverts joining up to four adjacent islands.

Sheikh Zayed Bridge

290m long (five-span) twin bridge with prestressed concrete voided deck slab and 300m long six-span single bridge with prestressed concrete voided deck slab, widening/ reconstruction of the approach roads and associated utilities work.

New Road Tarif – Madinet Zayed – Liwa

24km dual carriageway and three underpasses, and five oil & gas pipeline culverts.

Internal Roads for 100 Low Cost Houses in Al Waqan

Township development roads, footpaths, utilities, sewer networks and sewage treatment plant complex.

Al Muqatara/Himeem Road (Sahil Road)

47km road works and two underpasses.

Bridge over Truck Road between ME11 & ME12 at Mussafah

Bridge work and link roads, and seven gas pipeline culverts.

Internal Roads for 200 Low Cost Houses in Al Quo’A

Township development roads, footpaths, utilities, sewer networks and sewage treatment plant complex.

Rehabilitation & Widening of Abu Dhabi – Dubai Road

18km of four-lane Highway and one Interchange at Al Reef Palace

Roads & Drainage in Turfana & Rifaa

The contract provides for the construction of roads and drainage in Turfana and Al Rifaa Areas in the City of Sharjah.

Directional Ramp from Al Khail Road to Financial Centre Road

The project consist of an additional two-lane ramp connecting the Al Khail road to the existing upper deck of the Financial Centre Road.

View details

Extension of Academic City Road

The project is located at the eastern part of Dubai urban area, the road corridor is located between Emirates Road to the west and Dubai Outer Bypass to the east running north south direction with an approximate length of 25km bounded by Dubai-Al Ain Road and Al Yalasis Street.

Improvement of Sheikh Mohammed Bin Zayed Road

The project is located at the eastern part of the Dubai urban area, running north south direction. The full project area is bounded by Arabian Ranches Interchange to the north and Trucks Road at Dubai/ Abu Dhabi Border to the south, parallel to Sheikh Zayed Road (E11) to the west.

Engineering Works for Dubai Silicon Oasis Authority

The project included junction improvements, with a free right turn lane at the junction of Road 4, Dubai Silicon Oasis (DSO) and Academic City Road, two-lane right side carriageway for Road 5 and its right out junction with Academic city road.

Al Minhad Airbase, Pavement Works for Al Minhad Airbase

The project included completing and maintaining the runway asphalt paved works for Zone 1 and creation of paved/ unpaved shoulder for the runway at both Zone 1 and Zone 2.

Cycle Track Underpass at Meydan

The project is a part of the Dubai-wide cycle track network. The scope of this project included construction of an underpass to facilitate the cycle track to cross Meydan Road near the Nad Al Sheba area. The proposed underpass consists of 56m of box section and a total length of 250m of channel section.

Heavy Vehicle Gates in Jafza South

The project involved the construction of two heavy vehicle gates leading to JAFZA south development. Both gates have six inbound lanes and six out bound lanes. The pavement is predominantly asphalt and at the entry location block paving is used.

Mudon P-123 – Roads & Infrastructure Construction

Comprehensive Improvements of the Parallel Road

The project is a temporary tie-in for the newly constructed RTA projects. It will connect the east and the west parallel roads to Sheikh Zayed and Sheikh Mohammed Bin Zayed Road, in addition to the proposed link to Discovery Garden area on the East Parallel Road. Most of these movements will be intersected with a temporary roundabout.

Arabian Ranches 2 Development Al Qudra Road U-turn Access

Roads in Al Quoz 3

Al Quoz 3 lies in sector 3 of Dubai Emirates Sectors subdivision plan and comprises of community 358 & 359 in the south western part of Dubai urban area.

Final Roads & Infrastructure Works

The scope of this project included the construction of remaining works at Victory Heights project, comprising; asphalt roads, cable laying for villa connections and sewerage connections.

Improvement of the 5th Industrial Intersection/Sharjah (Emirates Road) Second Stage

This project is located along with Emirates Road starting from the limits of Sharjah/ Ajman interchange and continues with Emirates Road to include the existing Al Dhaid full cloverleaf interchange, the existing University dumbbell interchange and the existing King Abdul Azeez.

Improvement of Al Hamidiya Interchange, Ajman

Improvement of Al Hamidiya Interchange - Emirate of Ajman. The project included but was not limited to the following; removal of the existing bridge, construction of viaducts, construction of overpass and underpass, relocation of existing services and construction of new services and associated electrical and street lighting works.

Dubai Industrial City – Roads & Infrastructure Resumption of Works

The project comprised the completion of all sewerage and water works within the areas of contracts 3 & 4.

Improvements of Al Sufouh Road Network – Roads R3 & R5

This amendment works were to carry out the road works and the access surrounding the following Metro Stations; Al Quoz Station, Al Barsha Station, Burj Al Arab Station, Tecom Station, Nakheel Station, City Centre Station and Jebel Ali Station.

The Palm Jumeirah Gateway Towers Roadway Access

Victory Heights Golf & Residential Development LLH

The Palm Jebel Ali, Construction of Crescent E Roads & Infrastructure

Dubai Creek Crossings Seventh Crossing (Bur Dubai Side)

View details

The Palm Jumeirah – Crescent Carriageway Reinstatement

The scope of works includes, but is not limited to the following; construction of road works including parallel parking, footpaths, driveway to plot, traffic signs and ancillaries, tie in to existing and other proposed roads and any re-instatement works affecting existing construction across the Crescent.

Dubai Sports City, Vehicular Bridge/Filtration Room

Dubai Bypass Phase III, Al Qudra Bridge

TECOM Roads Improvements, Infrastructure Works

The project site is located in TECOM Site A,B, C and D. The project aims to implement the rewiring improvements recommended by the approved traffic impact study, to facilitate the movement on the internal network and the tie-in points with the surrounding Dubai Municipality road network, in order to accommodate the increasing traffic within TECOM sites A and B.

Dubai Waterfront – Madinat Al Arab – Al Oud District A Construction

The Dubai Waterfront project is a landslide development located at the base of the Palm Jebel Ali. Phase 1 runs parallel to the coast for a distance of approximately 3.5km.

Development of Mirdif Interchange

The site is located at the intersection of Khawaneej Road with Algeria Road between Mirdiff and Al Muhaisnah.

Dubai Industrial City Phase 1 Roads & Infrastructure

The Dubai Industrial City site is bounded by the proposed Jebel Ali Airport City to the East, Emirates Road to the north the Abu Dhabi border to the west and the proposed Outer By-pass Road to the south.

Mirdif Buildings Package: Road & Infrastructure Works

The project site is located in Community 251 to the East of Algeria road and north of Tripoli Road and adjacent to Mushrif Park. The works comprised the roads and infrastructure works, including all services.

Dubai Healthcare City, Phase 2 Roads & Services (Areas 4 & 5)

This project is situated in areas 4 and 5 of DHCC II area. The project consisted of the construction of roads, foul sewerage, storm water drainage, potable water supply, irrigation, street lighting, electricity ducts and sub-station buildings and telecommunications ducts.

The Palm Jumeirah Bridges, Viaducts & Ramps Additional Works Fronds L, M & O

The Villa at Dubai Land, Road & Infrastructure Package

The Villa, a unique residential development with 2,000 residential dwelling units.

Widening of Al Qudra Road

The project included the improvement and widening the two-lane, two-way existing Al Qudra Road in to a four-lane duel carriageway with a 5.2 median, the total length of the road is 10km.

Mirdif Villas Roads & Infrastructure

This project is located in Community 251 Mirdif to the east of Algeria Road and north of Tripoli Road and adjacent to Musrif Park. The works comprised; road infrastructure works, including all services.

Free Zone South Infrastructure, Phase 3B

The project located at Jebel Ali Free Zone South.

Roads in Nadd Al Hamar, Phase 2

The project comprised construction of Phase 2 approximately 38.70km of secondary arterial, collector and local roads in community 416 in Nad Al Hamar covering an area of 730 hectares.

Al Qudra Bridge

The project provides a grade-separated free flow through movement for traffic at Al Qudra over Jebel Ali-Lihbab road.

Emirates Living Development, DM Lateral Road

The Palm Jumeirah Bridges, Viaducts & Ramps

View details

The Gardens Interchange

The project comprises of the construction of an interchange on Sheikh Zayed Road before Interchange 6 and after Interchange 5

Alternative Route for Sharjah to Ras Al Khaimah Road

The works form the northern section of the proposed Sharjah to Ras Al Khaimah freeway, running from a point just north of the existing Umm Al Quawain - Falj Al Mualla road to tie in to the existing Sharjah - Ras Al Khaimah road approximately 8km south of the Clock Tower Roundabout in Ras Khaimah.

Roads around Burjuman Centre

The project located in community 317, bounded by the roads - Trade Centre Road to the east, Khalid Bin Waleed Road to the north, al Mankhool Road to the West, and Al Kuwait road to the south.

The Green Community, Phase 1B – Road Works & Infrastructure

This contract comprised the construction of road works and infrastructure of Phase 1B; The Site is located in part of Dubai Investment Park to the North of Hibab Road between Dubai Ring Road and the proposed Outer Bypass and to the South of the proposed extension of Road E77.

Roads in Al Quoz Residential Area

Construction of internal roads network in Al-Quoz Residential Area comprised.

Roads & Footpaths in Jafliyah

Construction of the internal roads network in Al-Jafliyah Residential Area comprised; Roads - total length of internal roads within the project boundary of approximate 20.55km, with new roads approximately 0.99km in length.

Roads in Za’abeel Area

The project comprised the construction of major and minor roads within the Zaabel area, bounded by Sheikh Zayed Road to the West, 2nd Za'abeel Road to the north, Oud Metha Road to the east and Road 309 to the south.

Academic City Roads

This project comprises the following main elements; Highway- The right-in and right-out at grade intersection at the junction of the existing Al-Ain Dubai Road with Academic City.

Rehabilitation of Hatta Road

The project involved the rehabilitation of Hatta Road. This road runs from Bukidra Roundabout in Dubai to the Oman border beyond Hatta.

Green Community, Phase 1A (67HA) Infrastructure & Road Works

This project comprised the construction of approximately 10.10km of local roads and associated car parks, construction of streetscape hard landscaping.

Al Mamzar Interchange

Construction of four bridge structures, roads, ramps and utility works of a partial clover-leaf, with a directional ramp interchange, connecting traffic from Al Mamzar and Al Qusais Areas to Al Ittihad Road.

Dubai International Airport Access Road & Parking, Phase 2

This project is for phase 2 Construction of the Dubai International Airport Access Roads.

Roads & footpaths in Al Mamza Area

Improvement of Roads and footpaths in the Mamzar area including the development of existing services.

Improvement of Al Hudhaiba Junction

This project is located at Al Wasl Road, Hudaiba/Al Wasl Junction and Hudhaiba Road. The contract comprises the construction, completion and maintenance of the improvement of Hudhaiba Junction.

Dubai Ring Road, Phase 2

The Dubai Ring road Phase 2 project comprised 26km of dual-three lane highway connecting the Jebel Ali-Hibab road with the Al Ain Road, where it joins Phase 1 of the Ring Road continuing to the emirate border with Sharjah.

Dubai Ring Road, Phase 1

This project consisted of construction of the Dubai Ring Road Phase 1. The contract begun approx. 2,000 meters south of the Al Ramool Road intersection where the Ring Road and extends to the beginning of Contract 3, about 1,200 meters north of Al Khawaneej Road.

Jumeirah Lakes Towers District Cooling

A waterfront community comprising both residential and commercial properties, including hotels and large retail outlets

View details

Roads in Nad Al Hammar

The works involved the construction of approximately 42km of Internal Road of Nadd Al Hammar Residential area, together with the associated works for the various services authorities.

Abu Dhabi Airport Chilled Water Network

The Abu Dhabi International Airport expansion included a chilled water network to Terminal 3

View details

Bukidra Interchanges

The project involved the construction of a portion of the back road, Bukidra Interchange, the new interchange at the Intersection of Road 313 with Al Ain freeway and an interchange at the intersection of the realigned Road 309 with the back Road.

View details

Baniyas Residential Development

This project comprised the construction of roads and infrastructure works for 411 Villas at Baniyas Residential Development (Abu Dhabi West).

View details

Jumeirah Jogging Track – Development of Jumeirah Corniche

The project forms part of Development of Jumeirah Corniche, stretching 7 km, between the Jumeirah Beach Hotel and south of Jumeirah Beach Park, in Jumeirah Dubai.

View details

ADNEC – New Exhibition Facilities Phase 2, ADNEC

The project comprised design and associated Road Works & Traffic Management,widening of Karama Street, relocation of Utilities, Footpaths, Storm Water and Street Lighting, Car Park and hardscaping for Aloft Hotel.

View details

Al Falah Community Development Infrastructure Works – Village 1

The project comprised construction of Infrastructure works for Al Falah Community Development Village 1

View details

Construction of Bridge at Officers City and between Two Bridges City

This project included the construction of an Underpass Dual Carriageway traversing the Mussafah Road/ Abu Dhabi International Airport Expressway.

View details

Improvements of Al Safouh Area Network Roads

The project mainly comprised the construction of road R3 which is connecting Al Safouh road to Dubai Marina, including a bridge over the water way.

View details

Improvements of Al Khail Road – Umm Suqeim Road Junction 17

Improvements of Al Khail Road, Al Khail Road-Umm Suquaim Road Junction consisted of constructing a new interchange on the Al Khail Road to replace the existing Roundabout with Umm Suquaim Road, as well as widening Al Khail Road from 4 to 6 lanes.

View details

Dubai Bypass Phase IV – Part 2

The project is located in the eastern part of Dubai urban area, running north south direction, bounded by Jebel Ali / Al Hebab to the north and trucks road to Dubai/ Abu Dhabi border to the south, and parallel to the Emirates Road (311) to the west.

View details

Mudon Package P123/M2035 Roads & Infrastructure Phase A

The works included the complete construction of Al Mudon Road infrastructure. Work comprised; road works, golf course box culvert under pass works, sewerage, sewerage pumping station, storm water drainage, Irrigation pipes works, electricity works; potable water works, and DU works.

View details

Al Ain Wildlife Park & Resort, World Deserts

The Al Ain Wildlife Park & Resort project comprised Preliminary and General Management Services, plus various Building and Civil Works for Site Wide Infrastructure and Utilities, as well as Mock Rock theming and Landscaping.

View details

Residential in Abu Dhabi

Demolition of Existing Villa. Construction of New Villa (Approx. 5000 m2).

Sharjah International Airport – New Runway at 250m Separation, Main Civil Works & Airside Systems Package

Construction of a new 4,000m Code F runway, two CAT IIIB approaches, at a separation of 250m of the existing runway at Sharjah International Airport.

View details

Protection of Airport Runway against Sea Erosion in Delma Island, Western Region

The project included reclamation of the eroded sections of the Coastline to a distance approx. 110m from the Centre Line of the existing runway.

View details

Saadiyat Beach Residential Infrastructure and Edge Protection Works

Infrastructure works for 660 Villas.

View details

Mugharraq Port Construction

Rehabilitation work for Marsa Mugharraq Port Phase 1, 2 & 3.

View details

Breakwater Developments

4-Lane Dual Carriageway, 3-Span Bridge, Car Parks and Utilities.

View details

The Palm Jumeirah PJ351 Crescent Sewer System

The scope of work included; sewerage system, TSE/ Irrigation Water, Potable Water, Fire Main. The sewerage comprised a network of approximately 12km of network, ei pipe work, manhole, chambers, discharge, washout chambers, pumping stations (4,) associated valve chambers (4) and MCC panels.

View details

Sewage Pumping Station (SN) & Its New Rising Mains

This project covered the upgrade of the existing Pump Station "S" and the construction of a new pumping station 'Sn' to serve the catchment area.

View details

Dubai Sports City, Areas 1, 2 & 4 Infrastructure Works

The project site, 242 hectares, is located within the Dubai Land Development project and is bounded to the north by Emirates Road and undeveloped land to the east, south west.

View details

International Media Production Zone, Package Roads & Infrastructure Works

The project area, measuring approximately 340 ha, is situated to the east of the large, elliptical-shaped roundabout, which is at the northern tip of Dubai Investment Park, on the Emirates Road

View details

Improvements of Interchange No.5

The project included improvement of the existing interchange No. 5 along Sheikh Zayed Road.

View details

Villa Complex for Dubai Silicon Oasis – Phase 1

The contract comprises the external drainage, sewerage, electrical, potable water, telecommunication, irrigation, road works, landscaping for 560 Villa complex and obtaining permanent power and water connections to villas. This project located on DSO Complex at the intersection of Emirates Ring Road and Al Ain Road.

View details

Jumeirah Beach Residence, Site Wide Infrastructure & Utilities

The project carried all service works, completed street lighting works; including the installation of street lighting pole foundation & cable laying.

View details

DMCC Industrial Area & Jumeirah Lake Towers

The project provided the completion of the infrastructure, including demolition and relocation of existing Jumeirah Island sewerage pump station.

View details

Arabian Ranches Development, Infrastructure, District 4

The project comprised the carrying out and completion of District 4 Infrastructure Works forming part of Arabian Ranches Development.

View details

Construction of a New Dam in Hatta

Initiated by the Dubai Municipality to collect rain water for irrigation of surrounding areas, comprising four Saddle dams.

View details

Palm Island (Jumeirah) Road Corridor & Access Scheme

This project is a component of the overall R757 project Palm Island (Jumeirah) Access Roads.

View details

Jumeirah Islands – Package 2 Infrastructure Works

Located between Emirates Golf Club and Jebel Ali Village, Sheikh Zayed Road.

View details

Interchanges & roadworks on Garhoud-Ramool Road

The project was envisaged by the Dubai Municipality to improve the road network and reduce the traffic at the signailsed junction of Ramool Road near the Garhood Bridge.

Sir Bani Yas Hotel Development & Hotel Refurbishment

Work included the refurbishment and upgrading of the existing building, comprising; construction of additional Satellite Buildings, Plant Buildings and Staff Accommodation Complex.

View details

Directional Ramps at Wimpy Interchange

Wimpy Interchange is located at the junction of Ramps Khor Road and Nad Al Hamer Road and it has designed as a full cloverleaf.

View details