The purpose of this project is to widen the existing Breakwater Road to four lanes in each direction, and construct access roads and parking areas for Marina Mall located in the Breakwater Area. A two span bridge also constructed on the Breakwater Road to provide sea water exchange, Rock Armouring, Construction of 2 No water Fountains, Traffic signal junction and associated utility installation, protection and relocation works.

The principal challenge of this project was working close to sea and construction of two span bridge across the sea for sea water circulation

The major works compromised:

  • 120,000 Cu m of Rock Armour

  • 630 tons of steel

  • 6250 cubic metres of concrete

  • 110,000 square metres of wearing course

  • 36,000Lm of Kerbstone

  • 35,000 Sqm of Interlocking Tiles

  • 28,000 Sqm Quarry Tiles

Included in the scope of the project were several services including water, drainage, irrigation and sewerage.

  • 3,500m of DI water pipeline

  • 10,300m of irrigation pipeline

  • 8,350m of drainage pipeline

  • 2,500m of sewerage pipeline

  • 14,800 Lm Street Lighting cable works

  • 6,750 Lm communication ducting works

Client: Abu Dhabi Municipality
Commencement Date: April 2000
Contract Period: 14 months